すべてのカテゴリ
galvanized steel angle iron
45 見つかった物
送電線付属品が付いている電気電流を通された鋼鉄電力線棒
Electrical Galvanized Steel Pole With Transmission Line Accesspries COST ----- Install cost The electrical part was designed can be installed within 6 minutes by using the non-screw connector, which definitely reduce your installation time and create lot of savings on the labor cost. The arm was designed can be connected with the pole by two arc fixing plate with two long screws. The new solar panel bracket was composed by sleeve, angle iron and U-steel fixed by screw, It is
熱いすくいは69のkvの鋼鉄送電ポーランド人に電力配分ポーランド人電流を通しました
Hot Dip Galvanized Steel Pole For 69kv Power Distribution Line COST ----- Install cost The electrical part was designed can be installed within 6 minutes by using the non-screw connector, which definitely reduce your installation time and create lot of savings on the labor cost. The arm was designed can be connected with the pole by two arc fixing plate with two long screws. The new solar panel bracket was composed by sleeve, angle iron and U-steel fixed by screw, It is very
送電線のプロジェクトのための15m電気電流を通された鋼鉄ポーランド人
15m Electrical Galvanized Steel Pole For Power Transmission Line Project COST ----- Install cost The electrical part was designed can be installed within 6 minutes by using the non-screw connector, which definitely reduce your installation time and create lot of savings on the labor cost. The arm was designed can be connected with the pole by two arc fixing plate with two long screws. The new solar panel bracket was composed by sleeve, angle iron and U-steel fixed by screw,
電力の標準的な長さのタワーによって電流を通される角度の鋼鉄 S235JR
Electric Power Tower Use Steel Angle Price S235JR With Standard Length Jiang Su Milky Way Steel Poles Co., Ltd. was established in 1988, is located in Yi xing City, Jiangsu Province, Wan Shi Town, covering an area of 35,000 square meters, annual output value reached 200 million . We have 20 years experience in design and production. Our main products are angle steel, cable, ground rod, Steel Tower, Communication Tower, Steel Pole and so on. The company has strong technical
専門の黒く熱い浸された電流を通された角度の鋼鉄 20*20*3mm ISO9001
Black And Hot Dipped Galvanized Equal Steel Angle For Electric Power Tower Name Hot Rolled Mild Structural Angle Steel 100x100 For Construction Certification ISO9001/BV/ Material All of our steel material are purchased from famous mill factory to assure the quality MOQ lowest quantity from 1Ton depends on different style . Application construction ,industry Model Number Q235/Q345/SS400/S235/S275, ss400 Dimensions 20*20*3mm-200*200*24mm or customized Delivery 20 working
Q235 100x100x16 はビーム橋伝達タワーのための角度の鋼鉄に電流を通しました
Q235 100x100x16 Galvanized Mild Steel Angle With Holes With Good Surface Our Company has 24 years experience on exporting angle steel, cable, ground rod, Steel Tower, Communication Tower ,Steel Pole (Street Lighting Pole, High Mast Pole, Power Transmission Pole, Signal Pole, Flag Pole) . With a wide range, good quality, reasonable prices and stylish designs, our products have been delivered to more than 70 countries and areas ,including America, Australia ,Russia ,Germany
電気二重腕を搭載する 15m 1800dan によって電流を通される街灯柱
15m 1800dan Galvanized Light Pole With Electrical Double Arms COST ----- Install cost The electrical part was designed can be installed within 6 minutes by using the non-screw connector, which definitely reduce your installation time and create lot of savings on the labor cost. The arm was designed can be connected with the pole by two arc fixing plate with two long screws. The new solar panel bracket was composed by sleeve, angle iron and U-steel fixed by screw, It is very
3mm の山形鋼八角形の鋼鉄電気伝達タワー公認 BV
3mm angle iron octagonal electrical steel Mono Pole Tower for transmission line Specification Available height 5-80m Electric pressure 10kv--550kv Material Q345B/A572,minimum yield strength>=345MPA, Q235B/A36,minimum yield strength>=235MPA Galvanized Hot dip galvanization,thickness is>=12um Delivery lead time 30 days after receiving 30% deposit Lifetime Minimum 25 years Structure Overlap connection/Flange connection Galvanizing standard EN ISO 146,ASTM/A123 Manufacturing and
13m の Q345 熱いすくいは電線のための電力の棒に電流を通しました
13m Q345 hot dip galvanized electrical power pole for electrical line COST ----- Install cost The electrical part was designed can be installed within 6 minutes by using the non-screw connector, which definitely reduce your installation time and create lot of savings on the labor cost. The arm was designed can be connected with the pole by two arc fixing plate with two long screws. The new solar panel bracket was composed by sleeve, angle iron and U-steel fixed by screw, It